| A viability survey will provide
an impartial assessment of the proposals covering the
following elements:
-
The site potential, gradients, topographical details,
earthwork or drainage required.
-
Potential client base including numbers of visitors and
peak user times.
-
Pricing structure and potential season revenue.
-
Element analysis with recommendations as to client
attraction detailed into element capital cost, operating
costs and potential revenue, e.g. Ski Slope, Snowboard
Park, Toboggan Run, Winter Wonderland play area, Luge
Run or Half Pipe.
-
Suggested surfaces, costings, gradients and complete
range of options on all products currently available
worldwide.
-
Slope and element design plus support equipment and
services analysis.
-
Staff analysis, wages structures and recruitment.
-
Presentation, advertising and marketing.
-
A full commercial viability analysis, with assistance on
grant application.
-
Support statistics currently available from our library.
-
Sourcing competent local construction contractors and
construction supervision.
-
Staff training.
-
'Hands on' lead in management to facility opening with
full financial and administrative control introduced.
Remember - we have 14 years operating experience which
you can draw from.
We are here to develop your project
with you from start to finish and ensure it's success. |